Please see here under a selection of projects that MSL have completed in this sector:

GSK, Irvine, UK

hClav Expansion Project 2015
MSL Engineering Ltd. were the mechanical contractor for the Clav Expansion Project in Scotland. This comprised

  • Fabrication, transport and installation of 7 modular units for the new Solvent Recovery Unit and 2 modular CIP skid units.
  • Supply, fabrication, transport, installation, support and testing of 8,000m of mainly stainless steel pipework in the extensions to the existing Tank Farm and existing Production Building
  • Installation of process and utility equipment

Project Consultant: WSP
PSCS: 
GSK
Value: €5,500,000
Duration: 9 months

GlaxoSmithkline, Currabinny, Carrigaline, Co.Cork

Upgrade of Building 101
Upgrade of Building 101
MSL were responsible for the demolition, relocation and installation of major process equipment and in excess of 10,000 metres of related pipework and ducting within an existing process building and a newly constructed annex. (For a detailed contract description, please see Case Study.

Project Consultant:Project Management Ltd
Value: € 6.5 million

Bristol Myers Squibb, Cruiserath, Co. Dublin

Mechanical Labour
Mechanical Labour & Commissioning Contract
MSL were principal mechanical contractor for the fabrication and erection of process pipework and installation of process equipment over a 2 year project schedule.
Subcontracts included painting and NDT.

Project Consultant: Fluor Ireland
Value: € 7.2 million

Pfizer Pharmaceuticals, Ringaskiddy, Co. Cork

OSP4 Finished Goods Building
OSP4 Finished Goods Building
MSL were principal contractor for the mechanical installation of process pipework and equipment in the OSP4 Finished Goods Building and external rack and Solvent Storage.

Project Consultant: Foster Wheeler
Value: € 4 million

Eli – Lilly SA, Dunderrow, Kinsale, Co. Cork

Purified Water Upgrade
Purified Water Upgrade
MSL were awarded the mechanical contract for the fabrication and installation of pipework and equipment. This included 1,200 metres of 3 inch high-purity pipework as part of a 5,000 metre project. All high-purity shop fabrication was completed at our purpose built clean room facility. Subcontracts included Insulation, Painting, NDT, and Passivation.

Project Consultant: Project Management
Value: € 2 million

GlaxoSmithkline, Currabinny, Carrigaline, Co. Cork

Building 120 Upgrade
Building 120 Upgrade
MSL were appointed as mechanical contractor for the replacement of an entire piping system in Production Building 120. This included off site fabrication, transport and erection on site of internal rack modules.

Project Consultant: Project Management Ltd
Value: € 2.2 million

Pfizer, Ringaskiddy, Cork, Ireland

OSP1OSP1 Filter Dryer Upgrade 2015
MSL Engineering Ltd. were awarded the contract for the mechanical fit out of a extension to the existing OSP1 production building. This involved installing a new filter dryer vessel through the side of the building onto the 2nd floor, all associated new pipework and tie-ins to existing plant across several floors and external racks. There was a substantial HVAC element to this project that was part of MSL’s remit.

Project Consultant: Jacobs Engineering Ltd.
PSCS: Jacobs Engineering Ltd.
Value: €1,400,000
Duration: 6 months

Eli – Lilly SA, Dunderrow, Kinsale, Co. Cork

Incinerator
Incinerator & Waste Tank Farm Upgrade
MSL were awarded the mechanical contract for the process equipment and storage tank installation. It also involved the fabrication and erection of all associated pipework.

Project Consultant: Jacobs Engineering
Value: € 2 million

GlaxoSmithkline, Currabinny, Carrigaline, Co.Cork

Gantrez New Production Building 2013
Gantrez New Production Building 2013
MSL were principal mechanical contractor for the construction of this new production building. The main mechanical scope included installation of 200 items of new process and utility equipment plus the fabrication and erection of 5000m of pipework over a 30 week project schedule.

Project Consultant:Project Management Group
Value: €3,000,000
Duration: 8 months

Pfizer Pharmaceuticals, Ringaskiddy, Cork, Ireland

Pfizer Pharmaceuticals
Dera Product Enabling 2014

Project Consultant: Project Management Group
Value: €3,000,000
Duration: 6 months

MSL were awarded the mechanical contract to installation a new process into the existing OSP4 production building. The project scope included fabricating over 4,000 metres of pipework in our offsite fabrication facility in Cork. This 4,000 metres of pipework was delivered to site and installed over a five month installation schedule. This involved carrying out 220 tie-ins and all installation of pipework in a live plant environment.

Talk to MSL Engineering Ltd. today

Contact us at +353 (0) 21 4513550 or email info@mslengineering.ie