Please see here under a selection of the projects that MSL have completed in this sector:

  • GSK, Irvine, UK

    hClav Expansion Project 2015
    MSL Engineering Ltd. were the mechanical contractor for the Clav Expansion Project in Scotland. This comprised

    • Fabrication, transport and installation of 7 modular units for the new Solvent Recovery Unit and 2 modular CIP skid units.
    • Supply, fabrication, transport, installation, support and testing of 8,000m of mainly stainless steel pipework in the extensions to the existing Tank Farm and existing Production Building
    • Installation of process and utility equipment

    Project Consultant: WSP
    PSCS: 
    GSK
    Value: €5,500,000
    Duration: 9 months

    GlaxoSmithkline, Currabinny, Carrigaline, Co.Cork

    Upgrade of Building 101
    Upgrade of Building 101
    MSL were responsible for the demolition, relocation and installation of major process equipment and in excess of 10,000 metres of related pipework and ducting within an existing process building and a newly constructed annex. (For a detailed contract description, please see Case Study.

    Project Consultant:Project Management Ltd
    Value: € 6.5 million

    Bristol Myers Squibb, Cruiserath, Co. Dublin

    Mechanical Labour
    Mechanical Labour & Commissioning Contract
    MSL ProjectMSL were principal mechanical contractor for the fabrication and erection of process pipework and installation of process equipment over a 2 year project schedule.
    Subcontracts included painting and NDT.

    Project Consultant: Fluor Ireland
    Value: € 7.2 million

    Pfizer Pharmaceuticals, Ringaskiddy, Co. Cork

    OSP4 Finished Goods Building
    OSP4 Finished Goods Building
    MSL Project MSL were principal contractor for the mechanical installation of process pipework and equipment in the OSP4 Finished Goods Building and external rack and Solvent Storage.

    Project Consultant: Foster Wheeler
    Value: € 4 million

    Eli – Lilly SA, Dunderrow, Kinsale, Co. Cork

    Purified Water Upgrade
    Purified Water Upgrade
    MSL ProjectMSL were awarded the mechanical contract for the fabrication and installation of pipework and equipment. This included 1,200 metres of 3 inch high-purity pipework as part of a 5,000 metre project. All high-purity shop fabrication was completed at our purpose built clean room facility. Subcontracts included Insulation, Painting, NDT, and Passivation.

    Project Consultant: Project Management
    Value: € 2 million

    GlaxoSmithkline, Currabinny, Carrigaline, Co. Cork

    Building 120 Upgrade
    Building 120 Upgrade
    MSL ProjectMSL were appointed as mechanical contractor for the replacement of an entire piping system in Production Building 120. This included off site fabrication, transport and erection on site of internal rack modules.

    Project Consultant: Project Management Ltd
    Value: € 2.2 million

    Pfizer, Ringaskiddy, Cork, Ireland

    OSP1OSP1 Filter Dryer Upgrade 2015
    MSL Engineering Ltd. were awarded the contract for the mechanical fit out of a extension to the existing OSP1 production building. This involved installing a new filter dryer vessel through the side of the building onto the 2nd floor, all associated new pipework and tie-ins to existing plant across several floors and external racks. There was a substantial HVAC element to this project that was part of MSL’s remit.

    Project Consultant: Jacobs Engineering Ltd.
    PSCS: Jacobs Engineering Ltd.
    Value: €1,400,000
    Duration: 6 months

    Eli – Lilly SA, Dunderrow, Kinsale, Co. Cork

    Incinerator
    Incinerator & Waste Tank Farm Upgrade
    MSL ProjectMSL were awarded the mechanical contract for the process equipment and storage tank installation. It also involved the fabrication and erection of all associated pipework.

    Project Consultant: Jacobs Engineering
    Value: € 2 million

    GlaxoSmithkline, Currabinny, Carrigaline, Co.Cork

    Gantrez New Production Building 2013
    Gantrez New Production Building 2013
    MSL were principal mechanical contractor for the construction of this new production building. The main mechanical scope included installation of 200 items of new process and utility equipment plus the fabrication and erection of 5000m of pipework over a 30 week project schedule.

    Project Consultant:Project Management Group
    Value: €3,000,000
    Duration: 8 months

    Pfizer Pharmaceuticals, Ringaskiddy, Cork, Ireland

    Pfizer Pharmaceuticals
    Dera Product Enabling 2014

    Project Consultant: Project Management Group
    Value: €3,000,000
    Duration: 6 months

    MSL were awarded the mechanical contract to installation a new process into the existing OSP4 production building. The project scope included fabricating over 4,000 metres of pipework in our offsite fabrication facility in Cork. This 4,000 metres of pipework was delivered to site and installed over a five month installation schedule. This involved carrying out 220 tie-ins and all installation of pipework in a live plant environment.